Environmental Operations · Audit Pack Builder

One Exportable Audit Pack from One Operating Record

Bundle SPCC inventory, labels and QR, containment calculations, integrity schedule, inspections, training certificates, proof packages, manifests, financial history, and AP handoff records into one exportable audit pack.

Inventory, labels, containment, integrity

Inspections, training, proof, manifests

Financial history + AP handoff records

Reproducible calculation runs

What goes into the audit pack

Every artifact F2 Core captures during normal operations is available for the audit pack — no rebuild at review time.

SPCC inventory

Tanks, containers, capacities, materials, locations, and asset-level history.

Labels and QR

Label catalog, asset dashboards linked from QR codes, label currency status.

Containment calculations

Reproducible containment calculation runs with inputs and PASS / FAIL output.

Integrity schedule

Last and next due dates for inspections; overdue items flagged.

Inspections + corrective actions

Inspection findings, corrective work, evidence, due dates, resolutions.

Training certificates

Training records with attendees, certificates, completion and expiration dates.

Pickup proof packages

Per-pickup signed proof, manifests, BOLs, weigh tickets, tire/battery counts.

Manifests + chain-of-custody

Hazmat manifests, transporter ID, disposal facility, signatures, timestamps.

Financial history

Per-event invoice, credit, no-charge, dispute records — locked to event creation snapshot.

AP handoff records

AP sent / accepted / rejected / corrected status per event with timestamps.

SPCC / compliance flow

From inventory to inspector view

SPCC inventory connects to labels and QR, containment calculations, integrity schedule, inspections and training. Plan generator and audit pack export are downstream of the same source records. Audit gaps surface at every step — missing data, overdue inspections, failed containment calculations, or missing training records all route into the gap queue.

SPCC compliance and audit workflow showing tank inventory, labels and QR, containment calculation with precipitation and PASS/FAIL, integrity schedule with last and next due, inspections training and corrective actions, plan generator output as PDF or Word with version, audit pack as PDF bundle with CSVs, and read-only inspector audit view. Exceptions for fail/missing/overdue/missing-record route to the audit gap exception.
SPCC inventory → labels & QR → containment → integrity → inspections & training → plan generator → audit pack → inspector view. Plan generator is Phase 2 unless the pilot includes it.
Proof workflow

Required proof becomes audit-ready evidence

Each workflow has a configured proof requirement — required vs optional artifacts by asset, vendor, and event. Proof can be uploaded from the vendor portal, by an internal owner on behalf of a non-portal vendor, or generated by the system (such as before/after tank levels where AFMS or telemetry is connected). Document validation runs before the proof clears the closeout gate.

Proof workflow showing proof requirement rule by asset/vendor/event, artifact checklist with required and optional items, three upload sources (vendor portal upload, internal manual upload for email/SMS/phone vendor, system-generated data such as before/after levels), document validation for type/date/amount/completeness, proof accepted decision, accepted path clears closeout gate, rejected path blocks invoice and AP and routes to correction loop.
Required artifacts → upload (portal / internal / system) → validation → accepted or returned for correction. Missing proof blocks invoice and AP closeout.

Audit Gap Review — see gaps before the auditor does

The Audit Gap Review queue surfaces every condition that would create an audit finding. Each gap links back to the screen needed to fix it.

Missing label

Tanks or containers with stale or missing labels surface in the audit gap queue.

Missing manifest

Hazmat or regulated pickups with no manifest in the document library are flagged.

Overdue inspection

Integrity inspections past due date are flagged with site and asset context.

Stale tank record

Tank records that have not been verified in the configured window are flagged.

Incomplete containment data

Containment areas without rainfall input, geometry, or displacement values surface as gaps.

Missing training

Required training topics with no current certificate flagged with site and role.

What's MVP, what's Phase 2

Audit pack export bundles operational records into one PDF/CSV deliverable with a manifest. Export logs the user, timestamp, and file list. The pack is built from the same records the operating workflows already capture — no separate audit data entry.

SPCC plan generator (full plan document output) and advanced audit pack automation are Phase 2 unless the pilot scope confirms otherwise. MVP scope covers inventory, labels and QR, containment calculations, integrity schedule, inspections, training, proof packages, and financial history.

MVP: bundle existing operational records into one exportable pack.

MVP: audit gap queue surfaces missing data before review.

MVP: reproducible containment calculation runs with inputs and outputs.

Phase 2: SPCC plan generator (full plan document output).

Phase 2: advanced audit pack automation.

Compliance review by qualified professionals — F2 Core does not certify.

Environmental compliance disclaimer

F2 Core supports environmental workflows, organization, documentation, and evidence readiness. It is not a substitute for legal advice or a qualified environmental compliance review.

See the audit pack on real dealership records

Walk through inventory, labels, containment, integrity, inspections, training, proof packages, financial history, and the AP handoff records on a real-world dealership audit pack export.